Snapper 1602 manual Packing, Assembly

Models: 1602

1 16
Download 16 pages 28.43 Kb
Page 2
Image 2
PACKING

PACKING

The 4 and 6 H.P. Sno-Aways are delivered complete in their separate cartons. The carton con- tains:

1 - Frame, Rotor, Engine and Wheel Assembly

1 - Handle Assembly

1 - Spout Adjusting Rod

2 - Skid Shoes

1 - Bag of Hardware

Should shortages of any of the above items occur, advise by stating packers number listed on the green packing slip,.sarial number of Sno-Away, part number and description of items missing.

ASSEMBLY

1.Fasten the handle assembly to the mount- ing brackets as shown at (l), Figure 1, using the (4) 3/8-16 x 2’: capscrews, 3/8” plain washers, 3/8” lockwashers and 3/8” hex nuts.

2.The throttle cable assembly is coiled around the engine for shipping purposes. Uncoil the cable and attach ‘to the housing a&nbly using the (2) 32” x l/2 self-tapping screws. The cable is held in place by the clamp on the lower portion of the right handle as shown at (2), Figure 1.

Figure 1.

Figure 2.

3.Insert the lower end of transmission shift rod through the hole in the shift lever and fasten in place with a cotter pin as shown in Figure 1.

4.Insert the Touch-0-Matic extension wire through the wire clamp. For proper belt tension, adjust as shown in Figure 2.

5.Attach the spout control cable as shown in Figure 3. Insert the lower end of the spout control rod in the nylon bearing on the ,blower housing and hold in place with (2)3/32x 5/8”cotter pins. Tli spout control rod support bracket is mounted in a.. reverse position for shipping purposes. Detach and mount as shown in Figure 4. Tighten clamp as nec- essary to hold spout in desired position.

Figure 3,.

2

Page 2
Image 2
Snapper 1602 manual Packing, Assembly