C | D |
| |
| E |
A |
|
B |
|
Figure 12. Install Lower Tube
A.Lower Chute Rod
B.Mounting Plate
C.Rubber Strap
D.Discharge Deflector
E.Locknut
LOWER TUBE INSTALLATION
1.Lift discharge deflector up (D, Figure 12).
2.Insert lower chute rod (A) into mounting plate (B).
3.Pull rubber strap (C) and secure by placing hole clos- est to knob in strap completely over locknut (E).
CONNECTING UPPER & MIDDLE TUBE
1.Slide the upper tube (E, Figure 13) into cover (B) aligning ridge (C) with cutout (D) as shown.
2.See Figure 14 for correct hole location and secure the upper tube (E) to middle tube using screw (F).
2.Slide middle tube (D, Figure 14) into upper tube (E).
3.Slide middle tube (D) over boot (A). Pull strap (B) and place hole completely over pin (C).
Tube Installation
D |
C |
B |
A |
Figure 13. Install Upper Tube to Cover
A.Upper Tube
B.Cover
C.Ridge, Upper Tube
D.Ridge Cutout
44” Frame Hung Mowers |
50” Frame Hung Mowers |
44” Free Floating Mowers |
50” Free Floating Mowers |
D |
E |
F |
B |
C |
A |
Figure 14. Install Middle Tube
A.Lower Chute
B.Strap, Rubber
C.Pin
D.Middle Tube
E.Upper Tube
F.Screw, 1/4 x 3/4
9