520 Single Stage Snowthrower

 

 

 

 

 

Quick Setup List -

 

 

 

Page

Setup Procedure

Steps to Perform

 

4

Unbox & Assemble

Remove Unit From Box.

 

 

 

Install Discharge Chute

 

 

 

Assemble Handle Bars

 

 

 

 

(Be careful not to pinch the auger cable)

 

 

 

Mount Clean-Out Tool in storage position

 

 

 

 

on handle

 

 

 

 

 

 

5

Fill Gas Tank

Fill Gas Tank

 

 

 

 

 

 

6

Lubricate Snowthrower

Lubricate all grease & oil points

 

 

 

 

 

 

7

Test Run

Check Primer

 

 

 

Check Choke

 

 

 

Check Recoil Starter

 

 

 

Check Electric Starter (Where Applicable)

 

 

 

Check Auger Control Cable

 

 

 

Check Kill Switch

 

 

 

Check Chute Rotator

 

 

 

Check Deflector

Additional information concerning functional

tests, general adjustment procedures, and the location of normal lubrication points are

included in these instructions.

Although all required lubrication and normal adjust- ments on factory-assembled components are done at the factory, this additional information is provided to assist you in ensuring that each unit is delivered to the customer in proper working order.

5/2005

3

Page 3
Image 3
Snapper 5201E, 5201M manual Quick Setup List