Initial Assembly

Lift discharge

chute and slide

bag over chute.

Make sure bag

noose fits over

top of discharge

chute and notch

in chute bottom.

Pull drawstring tight.

Figure 22. Discharge Bag - North American Models

Slide bag over dis- charge chute. Make sure bag noose fits over top of discharge chute and notch in chute bottom.

Pull drawstring tight.

Figure 23. Discharge Bag - CE Models

Install Discharge Bag

This product comes with a discharge bag for collection of debris as it exits the discharge chute. Install the bag as shown in Figure 22 or 23.

Add Engine Oil

Refer to “Engine Oil Type and Capacity” in the Regular Maintenance section for oil type and fill procedures.

Add Fuel

Refer to “Adding Fuel” in the Operation section for fuel specifications and filling procedures.

22

Page 23
Image 23
Snapper E55140BV manual Install Discharge Bag, Add Engine Oil, Add Fuel