Snapper HD4685, HD4686 BATTERY INSTALLATION Continued from Previous Page, Pre-Operation Check

Models: HD4686

1 4
Download 4 pages 18.05 Kb
Page 2
Image 2
3.BATTERY INSTALLATION (Continued from Previous Page)

3.BATTERY INSTALLATION (Continued from Previous Page)

E. Connect over flow tube and route as shown in Figure 2.

PRE-OPERATION CHECK

Complete all items on the Pre-Operation Checklist as instructed.

 

BATTERY CABLES ARE

 

CONNECT OVER FLOW TUBE

INSTALLED AT THIS TIME

 

SHOWN REMOVED FOR

 

TO BATTERY

INSTALL NUTS

BETTER VIEW OF BATTERY

 

 

 

HERE

42” DECK

33” DECK

INSERT TUBE INTO HOLE

IN SEAT PEDESTAL

ONCE INSTALLED

ROUTE TUBE AWAY

FROM TOP OF DECK

FIGURE 2

DISCHARGE DEFLECTOR

A.The discharge deflector on 33”, 42” & 48” Models are shipped in the “UP” position. Remove rubber band, lower discharge deflector and secure to deck with carriage bolt(s), flat washer(s) and wing nut(s) furnished with the deck. See Figure 3. NOTE: 38” Models are shipped with discharge deflector removed. Follow instructions to install deflector.

1.IMPORTANT: Deflector spring is under tension, be careful when removing. Remove carriage bolt and nut that secures pivot rod to the deck. Pivot rod contains deflector spring. Mounting rod should not be removed from deck.

2.Insert pivot rod partially into deflector hinge, slide spring onto rod with straight leg on top, then insert rod through other hinge and then into mounting rod. Insert hooked end of spring into deck. See Figure 3.

3.Secure pivot rod to deck using carriage bolt and nut. Tighten securely. See Figure 3.

ELECTRICAL CIRCUIT

The electrical connection at the engine is shipped disconnected to protect the electrical system when the battery is installed and MUST BE THE LAST STEP in preparation.

A.Connect electrical circuit at rear of the engine. See Figure 4.

LUBRICATION and FUEL

1.Engine

A. Perform normal engine service, oil and fuel, according to engine manufacturer’s recommend- ations found in the Engine Owner’s Manual.

INSTALL NUTS

HERE

DEFLECTOR SPRING

STRAIGHT LEG OF

SPRING ON TOP OF

DISCHARGE

DEFLECTOR

DISCHARGE

DEFLECTOR

DO NOT REMOVE

MOUNTING ROD

38” & 48” DECK

FIGURE 3

FIGURE 4

PIVOT

ROD LOCKNUT

SPRING

SLOT IN

CARRIAGE

BOLT

2

Page 2
Image 2
Snapper HD4685 BATTERY INSTALLATION Continued from Previous Page, Pre-Operation Check, 42” DECK 33” DECK, 38” & 48” DECK