Snapper Out Front Z-rider Mower manual

Models: Out Front Z-rider Mower

1 9
Download 9 pages 19.2 Kb
Page 5
Image 5
Manual background

1)REMOVE HARDWARE.

2)EXTEND CASTER OUT TO LAST SET OF HOLES.

3)REINSTALL HARDWARE.

SUPPORT ARM

FWD

FRONT CASTER

ASSEMBLY

HARDWARE

FIGURE 3

DECK FRAME

DECK STABILIZER

CHANNELS

PIN SHOULD BE IN MIDDLE

HOLE

NOTE: DECK BRACKET HAS

DECK SIZE IDENTIFICATION

NUMBERS STAMPED INTO ITS

SIDE. PIN LOCATION IN

CORRECT HOLE SHOULD

CORRESPOND WITH DECK SIZE.

FIGURE 4

STEP 7: Secure Transfer Shaft to Gear Box Shaft using two screws. See Figure 5. Tighten securely.

STEP 8: Place a 2x4 under each rear caster. Block the front caster wheels so that they will not roll.

STEP 9: Locate jam nuts on the right timing rod and the right rear deck hanger rod. See Figures 6 and 12. Note position of nuts. You must return both nuts to this position after attaching the deck.

JAM NUT SHOWN

TIGHTENED

AGAINST SWIVEL

TIMING

ROD

TIMING ROD

TIMING

ROD

FIGURE 6

STEP 10: Run each (2) jam nut up against the swivels on the timing rod and the hanger rod. The deck linkage will not float when the nuts are in this position. This will allow the use of the electric actuator on the deck to lift and attach the deck frame to the power unit.

STEP 11: Located on the hitch plates at the front of the Power Unit, rotate the Spring-Loaded Hitch Latch Pins to the unlatched position. See Figure 7.

STEP 12: Engage Parking Brake. Start Power Unit.

HITCH

LATCH

#9 WOODRUFF KEY (1/4 X 7/8)

PIN

PULL OUT, ROTATE UP TO UNLATCH POSITION

UNLATCHED

POSITION

3/8 - 16 X 3/8”

GEARBOX

SET SCREWS

SHAFT

TELESCOPING

 

DRIVESHAFT

 

FIGURE 5

HITCH

PLATE

FIGURE 7

5

Page 5
Image 5
Snapper Out Front Z-rider Mower manual