5.

Insert ground tube assembly (2) into cement as shown. Move assembly around to release any air

pockets in cement, then rest mounting plate on cement drainage hill. Apply some pressure to level

 

 

mounting plate on top of drainage hill. Level mounting plate and square with playing surface. Clean off

 

any excess cement on mounting plate at this time and place washers (24) on mounting bolts (19).

IMPORTANT!

NOTE ORIENTATION

Front of mounting plate (2) must be parallel with playing surface.

PLAYING SURFACE

IMPORTANT!

Check leveling of mounting plate several times with carpenter’s level while concrete is curing.

2

10

10

10

24

24

 

 

24

24

PLAYING SURFACE

IMPORTANT!: WAIT A MINIMUM OF 72 HOURS BEFORE GOING ON

TO NEXT STEP. CONCRETE MUST CURE. ALLOW ADDITIONAL TIME

FOR COLD, WET OR HUMID WEATHER.

7

08/06

ID# M88724C1

Page 7
Image 7
Spalding M88724C1 manual Playing Surface