STEP 5

1.Install the Handle Bar Cover Front onto the Front Post with 1pc of M5x15m/m Button Head Socket Screws.

(As shown in Fig. 12)

2.Take the Fix Handle Bar through the Hand Bar Cover Front and install it onto plate with 2pcs of M8x20m/m Button Head Socket Screws.

(As shown in Fig. 13)

3.Install the Handle Bar Cover Back onto the Front Post with 1pc of M5x15m/m Button Head Socket Screws.

(As shown in Fig. 14)

STEP 6

Install the Lower Swing Bar into the Left and Right Swing Bar Upper and fix it by using the Tension Adjuster.

(As shown in Fig. 15)

STEP 7

Install the Plastic Insert For Swing Bar (Lower End) into the Front Post and install Left and Right Swing Bar Upper with 2pcs of M8x20m/m Button Head Socket Screws and 2pcs of 5/16”x23x1.5T Flat Washers by using the M5 Allen Wrench.

(As shown in Fig. 16~18)

STEP 8

Install the Left and Right Pedal Bar into the U Shape Plate For Pedal with 2pcs of M8x50m/m Button Head Socket Screws, 2pcs of 5/16”x23x1.5T Flat Washers and 2pcs of M8 Nylon Nuts by using the N Wrench and the M5 Allen Wrench.

(As shown in Fig. 19)

STEP 9

Install the Swing Bar Upper Cover Front and the Swing Bar Upper Cover Back into the Front Post with 4pcs of M4x30m/m Self Tapping Screws. And plug the two Hand Pulse Cables into the Socket at back of Console.

(As shown in Fig. 20~21)

STEP 10

Install the Drink Bottle Holder onto the Front Post with 2pcs of M5x15m/m Socket Head Cap Screws.

(As shown in Fig. 22)

6

ZE20

 

Page 7
Image 7
Spirit ZE20 owner manual