2.Attach the stationary Handle Bar through the Hand Bar Cover Front and install it onto plate with 2pcs of M8x20m/m Button Head Socket Screws.

(As shown in Fig. 13)

3.Install the Handle Bar Cover Back onto the Front Post with 1pc of M5x15m/m Button Head Socket Screws.

(As shown in Fig. 14)

￿STEP 6

Install the two Lower Swing Bars into the Left and Right Swing Bar Upper and fix it by using the Adjusting knob.

(As shown in Fig. 15)

￿STEP 7

Install the two Plastic Inserts onto the Front Post axle. Install Left and Right Swing Bar Upper onto axle with 2pcs of M8x20m/m Button Head Socket Screws and 2pcs of 5/16￿x23x1.5T Flat Washers by using the M5 Allen Wrench.

(As shown in Fig. 16~18)

￿STEP 8

Install the Left and Right Pedal Bar into the U Shape Plate For Pedal with 2pcs of M8x50m/m Button Head Socket Screws, 2pcs of 5/16￿x23x1.5T Flat Washers and

2pcs of M8 Nylon Nuts by using the N Wrench and the M5 Allen Wrench.

(As shown in Fig. 19)

￿STEP 9

Install the Swing Bar Upper Cover Front and the Swing Bar Upper Cover Back into the Front Post with 4pcs of M4x30m/m Self Tapping Screws. And plug the two Hand Pulse Cables into the cables at back of Console.

(As shown in Fig. 20~21)

￿STEP 10

Install the Drink Bottle Holder onto the Front Post with 2pcs of M5x15m/m Socket Head Cap Screws.

(As shown in Fig. 22)

￿PLEASE LOCK DOWN ALL HARDWARE AFTER THE ACCESSSORIES HAVE BEEN ASSEMBLED.

6

ZE40

Page 7
Image 7
Spirit ZE40 owner manual As shown in ~18