Stanley Black & Decker MB05 user manual Operating the Breaker, Preparation for USE, Excavators

Models: MB05

1 34
Download 34 pages 8.98 Kb
Page 11
Image 11

OPERATION

OPERATING THE BREAKER

PREPARATION FOR USE

Read the section in this manual titled Pre-Operation Pro- cedures before operating a breaker. Failure to follow the preparation instructions can result in severe damage to the breaker and carrier and void the warranties of both.

POSITIONING THE CARRIER

BACKHOES

With the breaker tool in place on the material to be worked, position the backhoe so the boom is halfway up (45°) and the dipper holds the breaker almost vertical. Lower the loader bucket until the weight is off the front tires.

Apply down pressure.

Apply down force to the boom/dipper until the rear of the backhoe is raised off the ground. Rear tires and stabiliz- ers should be off the ground so the total rear weight of the backhoe is on the breaker tool. The breaker is more efficient when adequate down force is applied.

EXCAVATORS

With the breaker tool in place on the material to be worked, position the excavator so the dipper is at ap- proximately 45° and the breaker is almost vertical. The tracks of the excavator should be in line with the boom and the breaker.

Apply down force.

POSITIONING THE BREAKER TOOL ON THE WORK MATERIAL

Position the tool bit near the edge of the work material, not in the center or far from the edge. Position the tool 6

18 inches (depending on the material) from the edge. Breaking off smaller pieces of rock or concrete usually accomplishes more than trying to break larger pieces.

Break near the edge.

On flat material or rock, the breaker should be vertical or “curled” back slightly to direct the impact force down- ward and toward the backhoe. This directs the force back toward the edge of the work material. If the tool is positioned in the center of the work, or too far from the edge, the energy will be absorbed into the material without cracking it. Do not run the breaker longer than

MB05 User Manual ◄ 11

Page 11
Image 11
Stanley Black & Decker MB05 Operating the Breaker, Preparation for USE, Positioning the Carrier Backhoes, Excavators