SEQUENCE OF INSTALLATIONS

Cut a length of PVC pipe about 3.5 in. (9cm) longer than the wall thickness at the opening. Glue the vent terminal to this section of pipe. Slide the wall plate over the pipe to stop against the vent terminal. Place a bead of caulking (not supplied) around the gap between the pipe and cover plate. Apply enough to fill some of the gap between the pipe and wall. Place some of the caulking on the back of the plate to hold it against the wall after installation. If the vent pipe is installed up to the wall, with a coupling on the end against the wall opening, the pipe with the vent terminal can be prepared for gluing before inserting through the wall. Slide the pipe through the wall and insert into the coupling on the other side of the wall, making sure that the vent terminal ends up pointed in the correct position (see Figure 23).

FIGURE 23

INSTALLATION SEQUENCE

For installations in the City of Los Angeles, California Category IV PVC Pipe such as that manufactured by Brownline Pipe Company, must be used as vent pipe material.

CAUTION

Vent terminals supplied with heater must be used.

NOTE: BEFORE BEGINNING INSTALLATION OF ANY VENT PIPE READ THE VENT PIPE MANUFACTURER’S INSTALLATION INSTRUCTIONS.

1.After the points of termination have been determined, use the cover plates as templates to mark the holes for the vent pipes to be inserted through the wall. BEWARE OF CONCEALED WIRING AND PIPING INSIDE OF WALL. If the vent terminals are being installed on the outside of a finished wall, it may be easier to mark both the inside and outside wall. Align the holes by drilling a hole through the center of the template from the inside through to the outside. The template can now be positioned on the outside wall using the drilled holes as a centering point for the template.

A.MASONRY SIDE WALLS Chisel an opening approximately 1/2 in. (1.3cm) larger than the marked circle.

B. WOODEN SIDE WALLS Drill a pilot hole approximately 1/4 in. (0.64cm) outside of the marked circle. This pilot hole is used as a starting point for a saws-all or sabre saw blade. Cut around the marked circle staying approximately 1/4 in (0.64cm) outside of the line. (This will allow the vent pipe to easily slide through the opening. The resulting gap will be covered by the vent terminal cover plates.) Repeat this step on the inside wall if necessary.

2.Cut a length of 3 in. PVC pipe about 3.5 in. (9cm) longer than the wall thickness at the opening.

3.Glue the intake vent terminal to the section of the pipe.

4.Slide the wall plate over pipe to stop against intake vent terminal.

5.Place a bead of caulking (not supplied) around the gap between the pipe and the wall. Place some of the caulking on the back of the plate to hold it against the wall after installation.

6.If the vent pipe is installed up to the wall, with a coupling on the end against the wall opening, the pipe with the vent terminal can be prepared for gluing before inserting through the wall. Slide the pipe through the wall and insert into coupling on the other side of the wall, making sure that the vent terminal ends up pointed in the correct position (see Figure 24).

FIGURE 24

26

www.statewaterheaters.com

Page 26
Image 26
State Industries 0710 316888-002, GPH-90N warranty Sequence of Installations, Installation Sequence

0710 316888-002, GPH-90N specifications

The State Industries GPH-90N,0710 316888-002 is a high-quality water heater designed to meet the demands of both residential and commercial applications. Renowned for its durability and efficiency, this model serves as an essential component for facilities requiring reliable hot water supply.

One of the standout features of the GPH-90N is its impressive heating capacity, which allows it to deliver hot water quickly and effectively. This model boasts a heating input of 90,000 BTU per hour, making it suitable for large households or commercial establishments. The unit is designed to maintain consistent water temperatures, ensuring that users have access to hot water whenever needed.

The GPH-90N is also equipped with advanced technologies that enhance its operational efficiency. It features a modulating gas burner that adjusts its output to match the flow rate of hot water demanded, thereby optimizing energy use and minimizing operating costs. This technology not only improves performance but also extends the lifespan of the water heater.

Durability is a key characteristic of the State Industries GPH-90N. The unit is crafted from high-quality materials, including a robust stainless steel tank that resists corrosion and ensures long-lasting performance. This corrosion-resistant design is particularly beneficial in areas with hard water, where mineral deposits can be a significant concern. Additionally, the tank is insulated with high-density foam, which helps to maintain heat and reduce standby heat loss.

A crucial aspect of the GPH-90N is its user-friendly features. The control panel is straightforward, allowing users to adjust settings with ease. The water heater is also designed for simple maintenance, ensuring that annual servicing can be carried out with minimal disruption.

Safety is paramount in the design of the GPH-90N. It includes multiple safety features, such as a pressure relief valve and a safety shut-off mechanism, which provide peace of mind for users. This ensures that the unit operates safely under varying conditions.

In conclusion, the State Industries GPH-90N,0710 316888-002 is a powerful and efficient water heater that combines advanced technology with durable construction. Its high heating capacity and user-friendly design make it a reliable choice for both residential and commercial applications, ensuring that hot water is always available when needed.