2.Install the drive shaft into the center post by rotating and pressing down lightly on the shaft until the shaft drops down and engages with the gear box shaft.
3.Replace the plastic lower bushing to the bottom of the vertical center post.
4.Assemble the divider plate to the stationary fingers.
5.Assemble the
(See Fig.23).
6.Slide the divider plate down from the top of the agitator tube, until it is seated properly, allowing the agitator fingers clearance for rotation.
7.Assemble the divider plate and agitator assembly onto the vertical center post, making sure the indicator arrow on the divider plate is in position to line up with the upper spigot. Grasp the agitator tube and slide the assembly down the vertical center post and lock (Fig. 25).
Figure 25
Installing Divider Plate and Agitator Assembly
8.Install the sealer ring by squeezing the looped section and sliding down into the product cylinder.
NOTE
For proper operation of the freezer, the looped section of the sealer ring MUST be positioned to the back of the product cylinder (Fig.26).
BACK
Figure 26
Proper Installation of Sealer Ring
9.Roll the agitator tube
10.Rotate the agitator tube clockwise until the guide hole at the top of the agitator tube forms a complete circle with the hole at the top of the vertical center post (Fig.27).
Figure 27
Correct and Incorrect Alignment
of Vertical Center Post Guide Hole
11.Assemble the drive cap onto the agitator tube, aligning the guide pin in the drive cap with the guide hole in the vertical center post and pressing down.
16