TYPICAL INSTALLATION
MOUNTING (New Frame Construction)
10” ROUND DUCT | 4½” X 18½” |
|
| Mounting brackets | |
| TO 10” ROUND | |
| TRANSITION | |
|
| position for ½” ceil- |
|
| ing material. |
|
| CEILING |
|
| JOIST |
|
| (24” centers |
|
| shown) |
Blower |
| 10” ROUND |
| DUCT | |
in horizontal |
|
|
discharge position. |
| 4½” X 18½” |
|
| |
| MOUNTING | TO 10” ROUND |
| SCREW | TRANSITION |
Factory-shipped unit installed in new construction.
MOUNTING (Existing Frame Construction) | |||
2 X 4 FRAMING | 4½” X 18½” TO 10” | ||
ROUND TRANSITION | |||
(wide side down) | |||
| |||
4½” X 18½” |
|
| |
TO 10” ROUND |
| ||
TRANSITION |
|
| |
10” ROUND |
| 10” ROUND | |
DUCT |
| DUCT | |
|
| MOUNTING | |
|
| SCREW | |
MOUNTING |
|
| |
BRACKETS |
|
| |
(Attached to |
|
| |
opposite sides |
|
| |
of housing & |
|
| |
CEILING JOIST |
| ||
so housing is |
| ||
flush with | (24” centers |
| |
finished ceiling) | shown) |
|
Blower factory-shipped in straight-through
discharge position.
Page 2
TYPICAL INSTALLATION
MOUNTING USING HANGER KIT (included)
| HANGER | |
| KIT BOLT | |
| & WASHER | |
| EXTENSION | |
| SPRING | |
HANGER | 10” ROUND | |
KIT CHAIN | DUCT (INTAKE) | |
HANGER |
| |
KIT |
| |
| ||
4½” X 18½” |
| |
TO 10” |
| |
ROUND | HANGER | |
TRANSI- | ||
KIT NUT & | ||
TION | ||
WASHER | ||
| ||
| MOUNTING | |
| BRACKET | |
| GRILLE NUT | |
10” ROUND | (Install into | |
DUCT | square holes in | |
(OUTLET) | housing) | |
ACCESS | ACCESS | |
PANEL SCREW | ||
PANEL |
|
Blower
discharge position.
DUCTING (Horizontal blower discharge)
| ROOF CAP |
|
10” |
|
|
ROUND |
|
|
DUCT |
|
|
4½” X 18½” |
|
|
TO 10” ROUND |
|
|
TRANSITION | 10” |
|
|
| |
| ROUND |
|
| DUCT |
|
| 10” | WALL |
| CAP | |
| ROUND |
|
| ELBOW |
|
Two ways to connect ductwork to a
IMPORTANT: Remove shipping tape from damper
Remove the shipping tape from the damper flap and make sure that damper flap opens and closes freely inside the ductwork. Use duct tape to make ductwork connections secure and