OPERATION

Final Check List before Operation

1.Have all packing materials and tape been removed from the interior and exterior of the ice maker?

2.Did you clean the ice storage bin?

3.Have the installation instructions been followed, including connecting the machine to water, drain and electricity?

4.Has the machine been leveled?

5.Is the ice maker in a site where the ambient temperature is between 13ºC (55ºF) and 27ºC (80ºF) and the water temperature within 5ºC (41ºF) and 25ºC (77ºF) all year round?

6.Has the water supply pressure been checked to ensure a minimum of 20psig with a static pressure not to exceed 80psig?

7.Is there a clearance of at least 4 in. (101 mm) at the rear, and 0.6 in. (15 mm) at the sides and top for proper air circulation?

8.Has the power supply voltage been checked or tested against the nameplate rating?

9.Has the machine been properly grounded and connected into a three-prong AC outlet?

10.Is the ice maker plugged in?

11.Did you turn on the main water supply and the tap?

12.Did you check for leaks at all water supply and drainpipe connections?

13.Has the machine been connected to a floor drain? If you do not have a floor drain, a condensation pump will be required.

14

Page 15
Image 15
Summit BIM70 user manual Final Check List before Operation

BIM70 specifications

Summit BIM70 is a cutting-edge Building Information Modeling (BIM) software solution designed to enhance collaboration and streamline project management in the architecture, engineering, and construction (AEC) sectors. With its robust feature set and user-friendly interface, it has quickly become a preferred tool for professionals seeking to improve efficiency and accuracy in their workflows.

One of the standout features of Summit BIM70 is its advanced 3D modeling capabilities. Users can create highly detailed models that incorporate geometry, spatial relationships, and even attributes of building components. This allows for better visualization and communication among project stakeholders, ensuring everyone is on the same page from the initial design phase through to construction and maintenance.

Another key technology in Summit BIM70 is its real-time collaboration functionality. The platform supports multiple users working simultaneously on a single model, enabling teams to share updates, comments, and revisions instantly. This feature significantly reduces the likelihood of errors and miscommunication that can arise in traditional workflows, fostering a more integrated and cooperative working environment.

Summit BIM70 also incorporates powerful analytical tools that enable users to perform energy analysis, structural simulations, and cost estimates directly within the software. These capabilities allow for better decision-making early in the project lifecycle, leading to designs that are not only aesthetically pleasing but also energy-efficient and within budget constraints.

The software is compatible with various file formats and integrates seamlessly with other industry-standard applications, making it versatile and adaptable to existing workflows. Additionally, Summit BIM70 offers customizable templates and libraries, allowing users to standardize their processes and improve productivity.

In terms of user experience, Summit BIM70 features a sleek, intuitive interface that is easy to navigate, even for those who may be new to BIM technologies. Comprehensive training and support resources are also available, ensuring that users can maximize the platform's capabilities.

Overall, Summit BIM70 is at the forefront of BIM technology, offering a powerful suite of features designed to meet the evolving needs of the AEC industry. With its focus on collaboration, analysis, and ease of use, it is poised to help professionals deliver high-quality projects more efficiently than ever before.