Installation Notes
The Energy Control Unit shall be installed in dry, indoor locations ONLY. The Energy Control Unit shall be installed into a Pollution Degree 2 (or better) environment.
The Energy Control Unit may be installed into a standard 19” rack or mounted to a wall. A bracket is provided for rack installations. Using the screws provided, affix the bracket securely to the Energy Control Unit as shown.
If the Energy Control Unit is to be installed onto a wall
surface, use suitable screws to securely hold the unit. Install the unit with the input power, LAN, and GreenBus IITM connections facing down. The control buttons shall be facing upward. This orientation will ensure adequate cooling for the product while installed against a wall surface.
Troubleshooting
There are no
Energy Control Unit Wiring
Page 3 of 4
OSRAM and Logo are registered trademarks of OSRAM GmbH.
ENCELIUM and Polaris 3D are registered trademarks of OSRAM SYLVANIA, Inc
GreenBus II are trademarks of OSRAM SYLVANIA, Inc.
SEE THE WORLD IN A NEW LIGHT is a registered trademark of OSRAM SYLVANIA, Inc.