INTRODUCTION

Getting to know your Intrepid

This Intrepid has been put through a rigorous and unique testing procedure that ensures that it will last for many years with minimal service requirements. This procedure includes the following:

All assembled circuit boards are given a thorough visual inspection and are then tested in a bench- reference Intrepid.

The tested, assembled circuit boards are then installed in a new Intrepid and the whole unit is tested for every function and parameter.

The unit is put on a burn-in torture rack to test for any possible component failures.

It is then tested on an audio analyzer for all pertinent parameters.

The unit has all remaining chassis components installed and then undergoes a complete visual inspection, which assures that all Intrepids meet visual specifications.

The Intrepid then undergoes a critical listening and functional test.

Burn-In Time

This unit has a break in period of about 1 week during which continuous improvement in sound quality will be observed. It is recommended that music be played continuously through the unit during this time to expedite the break in period.

Reference Manual Conventions

For clarity purposes, references to buttons and LED’s will be shown in bold capital letters.

1