STEAMER OPERATION
STEP I - PREPARATION FOR USE
Set the unit on the floor and remove the water container. Check the inside of the container for sediment. Turn the container upside down and push the valve open and allow to close two or three times to insure it is functioning smoothly. If the container has been stored with water inside, it may be necessary to remove the water and clean the container. Follow the steps for care and cleaning.
STEP 2 - FILLING THE WATER CONTAINER
(PRIOR T O PLUGGING IN THE APPLIANCE)
Remove the water container with the handle and turn upside down. Unscrew the valve in the center of the base and pour water into the opening or hold under a source of running water until the container is filled to the desired level. Replace the valve and return the container to the upright position. Place the water container onto the base and make certain it seats properly into the cavity.
DO NOT FILL THE CONTAINER WITH HOT WATER. DO NOT ALLOW THE CONTAINER TO BECOME DRY DURING OPERATION AS THIS WILL SHORTEN THE LIFE OF THE STEAMER
STEP 3 - OPERATING THE STEAMER
Insure the ON/OFF switch is in the OFF position. Plug the steamer cord into a normal electrical outlet or approved extension cord. Turn the ON/OFF switch to the ON position. The switch will light when electricity is connected. Steam will be produced from the nozzle in a few seconds.