STEAMER ASSEMBLY
STEP
1
-
ATTACHING THE METAL ROD
Set the appliance on a steady
surface. The bottom metal rod is
threaded on one end. Screw the two
larger metal rods together. Insert the
bottom of the metal rod into the
holder on the unit base and screw
the setscrew until tight. (Caution: do
not over tighten) Screw the top
smaller metal rod (with hook) into
the top of the large metal rod.
STEP
2

-

ATTACHING THE STEAMER HOSE
Screw the end of the steamer hose
with the knurled knob onto the
threaded pipe on the top of the
steamer unit. (Caution: Do no t use
excessive force in tightening the
knob) Tighten by hand until it's no
longer turns. Hang the nozzle from
the metal rod. Prior to filling the
water tank, be certain that the
steamer's drain plug is properly
installed and tightened toprevent
leaking.
STEP
3
-
BEFORE FILLING THE WATER CONTAINER
Turn the water container upside down and inspect to see the valve
and spring assembly are functioning in the bottom of the container.
Place the container in t he reservoir and inspect that it seats
securely.