Copier Bulletin:
Date: | 4/8/2011 |
Page: | 1 of 3 |
Models: e-STUDIO1355 Series
Subject: Service Manual Correction – Tray Heaters
Overview
Corrections are needed to the “Connecting the Tray Heaters” section of the
Detail
Please download the corrected manual or store the following corrections with your service manual. The corrected manual is version 00a or later, posted on 3/25/2011. (Corrections are in red)
Location of the Incorrect Description
Installation > Main Machine > Installation > Connecting the Tray Heaters of the Main Machine (pages 54 ~ 56 in the
Corrected Text
Connecting the Tray Heaters of the Main Machine
The machine comes from the factory without the tray heaters already installed but disconnected. Tray heater installation is optional. The heaters should be connected if the location has high humidity.
Consult with the customer before connecting the tray heaters.
Doing this procedure connects the following
∙One unit below the transfer unit (if installed)
∙Two units in the paper tray unit (if installed)
∙One unit in the scanner unit (if installed)
∙One unit in the LCIT (if installed)