4 Replacement Procedures 4.17 Power Button Board and Switch Board
4-52 Satellite L350D/ Satellite Pro L350D/ EQUIUM L350D/ SATEGO L350D Maintenance Manual
Install the Power Button Board and Switch Board
Install the Power Button Board and Switch Board according to the following procedures and
Figures 4-31.
1. Connect the switch board flat cables to CN1 on the switch board.
2. Seat the switch board in the correct position.
3. Secure the switch board with two M2x3 black flat head screws.
4. Seat the Power button board in the correct position.
5. Secure the volume board with two M2x3 black flat head screws.