Trane specifications Installation- Electrical, Field Wiring Connections, GSSD 24V Field Wiring

Models: GSSD

1 18
Download 18 pages 46.24 Kb
Page 11
Image 11
Installation- Electrical

Installation- Electrical

Field Wiring Connections

Power wiring to the unit should be in- stalled per local electric codes by a professional electrician.

The wires can be run to the unit through the available knockouts

and to the control box in the top half of the unit.

Control wiring to the unit is 24 volt. The termination point identifications for the terminal strip is identified per Figure 5.

5Compressor

6Reversing valve (energized in cooling)

1Common

T-Stat

(X13510588020) Manual changeover: -two-stage heat -one-stage cool

TWE

(Sizes 031-065)

GSSD (Sizes 024-072)

GSSD 24V Field Wiring

R

F

Y2

O

C

W1

W2

R

G

Y

O

B

W1

W2

3

4

5

6

1

Figure 5: Field wire connections.

1K1 to Water Pump and L1 / L2

 

 

 

Hi Voltage

 

 

 

 

Low Voltage

 

Terminal Strip

 

 

 

for Low Voltage

 

 

 

 

 

 

to TWE

Pump Control

Ground

 

 

 

11

Page 11
Image 11
Trane specifications Installation- Electrical, Field Wiring Connections, GSSD 24V Field Wiring, Field wire connections