4.a. Remove the two flange nuts, hex bolts and saddle washers which secure the right side of the upper handle to the right side of the lower handle. See Figure
b. Remove the three hex nuts and bell washers from the weld studs beside the opening on the right side of the
5. a. Place the chipper chute over the weld studs keep- ing the slotted side towards the bottom. Loosely secure with the three hex nuts and bell washers that were removed earlier. Do not fully tighten the hex nuts at this point in the assembly. See Figure
b. Align the support bracket with the holes in the right |
| |
side of the upper and lower handles where the hex |
| |
bolts were just removed. Push up slightly on the |
| |
chipper chute in order to better align the holes in |
| |
the support bracket with the holes in the handles. | Figure | |
c. Replace the hex bolts, saddle washers and flange | ||
| ||
nuts to affix the support bracket to the handle |
| |
assemblies. See Figure |
|
d. Follow by tightening all hardware securely first on the chipper chute, then on the support bracket, and finally on the handle.
Attaching The Bag
6. a. Place bag under the upper handle assembly and slip the front opening on the bag over the discharge chute, making certain it is over the rim on the discharge chute. Follow direction of the arrows in Figure
b. Place the four straps on top of the bag over the | B, C, & D |
upper handle, hooking them on the studs to secure |
|
in place. See Figure | A & D |
7. Squeeze the clamp on the drawstring and pull the |
|
drawstring tight. Release the clamp. See Figure |
|
| Figure |
A
B
Figure | Figure |
3
Setting
Up Your
Chipper
Shredder
Vacuum