4.Remove the belt from the spindle pulleys.
5.Install the new belt around the spindle pulleys as shown and reinstall the belt covers. See Figure
6.Place the belt around the idler pulleys removed in step 3 with the “V” side facing in. Once in place, reinstall all the hardware and tighten the flange lock nut to secure the assembly. See Figure
7.Route the belt as shown in Figure
1.Remove the deck from beneath the tractor, (refer to Deck Removal on page 27).
2.Remove the hex washer screws securing the belt covers to the deck. See Figure
Hex Washer | Spindle Pulley | |
|
| |
Screws | Belt Cover |
|
|
| Belt Guards |
Idler Pulley |
| |
Spindle Pulley | Idler Arm | Spindle Pulley |
|
Figure
3.Remove the two idler pulleys by removing the hex screws and flange lock nuts that secure them to the deck and the idler arm. See Figure
Hex Screw | Pulley Cap | Hex Screw |
| ||
|
| |
|
| Idler Pulley |
Idler Pulley
Spacer | Belt Guard |
Belt Guard |
|
Flange Lock Nut
Idler Arm
Flange Lock Nut
Figure
NOTE: Take note of the position of the belt guards to ensure they are properly
4.Remove the belt from the spindle pulleys.
5.Install the new belt around the spindle pulleys as shown and reinstall the belt covers. See Figure
6.Place the belt around the idler pulleys removed in step 3 with the “V” side facing in. Once in place, reinstall all the hardware and tighten the flange lock nut to secure the assembly. See Figure
7.Route the belt as shown in Figure
Section 7 — Service |
| 31 |
| ||
|
|
|