GB
3
OWNER'S MANUAL • F330•E340
UPRIGHT POST
Connect the upper and lower meter wires together
and push the tension cable into the upright post
prior to fi tting the upright post to the main frame.
Secure the upright post to the main frame with
four chromed washers and Allen screws. Ensure
that the concave side of the washer faces the
handlebar support tube. First turn all the screws
loosely into place and then tighten them.
RESISTANCE KNOB
Make sure the display window shows 8 on the
knob. Remove the attachment screw and pull out
the resistance knob from upright post. Pull the
end of the resistance wire out from the handlebar
support tube and connect the resistance wire to
the lower end of the brake wire. Make sure the
resistance wire is tightly inserted. Push the wire
inside the handlebar support tube, place the
resistance knob over the hole in the tube and
attach it with the screw.
METER
Pop open the battery cover at the back of the meter
to assemble batteries. Close the cover. Remove the
cable ties from the wires of the handlebar support.
Connect the wires to the respective connectors
on the meter and then thread the wires into the
handlebar. Be careful not to damage the wires
when attaching the interface. Slide the meter on
the top of the handlebar support tube and attach
it with three locking screws through the plastic
sleeve.
SEAT
Attach the seat to the seat support: tighten the
locking nuts in opposite directions. Please note
that you can adjust both seat inclination and the
distance of the seat from the handlebar. Once the
distance and inclination are set how you want,
tighten the locking nuts carefully.
chrome

E340

8
E340

black