Assembly of Furnace

Your furnace requires the following items to be assembled or installed by the service person:

Feed Door Pull Handle

Feed Door Locking Handle

Blower(s) and Blower Controls

Electrical Connections

1.Remove all parts from inside the furnace and inspect for damage, including the firebrick as some breakage could occur during shipment.

2.Assemble the feed door pull handle as shown in Figure 9. Install thermostat assembly and cover (complete with handle) as illustrated in Figure 9.

3.Align thermostat control knob with flat on thermostat control shaft and press onto shaft. (See Fig. 9)

4.Attach feed door locking handle as in Figure 10 with screws and nuts provided. Note: Slotted holes are for adjustment of handle. Adjust handle until some pres- sure is required to lock feed door during firing sequence.

5.Install Honeywell Fan/Limit Control on rear of furnace cabinet as shown in Fig- ure 11.

6.Remove blower(s) from carton(s). Re- move junction box cover. Attach clip nuts as in Figure 10. Install blower(s) and gasket(s) with 1/4"-20x3/4" bolts as shown.

7.Wire right side blower first (See wiring diagram, Fig. 12 & 13) and replace cover on junction box on blower.

8.Wire left blower same as above and replace cover.

Check operation of shaker grates with grate handle before operating furnace.

Fig. 9

Fig. 10

Honeywell

FAN/LIMIT

CONTROL

4" ELECTRICAL JUNCTION BOX

BLOWER

ASSEMBLY

CLIP NUTS

GASKET (DO NOT USE CLIP NUT ON UPPER CENTER HOLE)

(MODEL 1300 - 1 BLOWER,

MODEL 1400 - 2 BLOWERS)

Fig. 11

13

Page 13
Image 13
United States Stove 1300 owner manual Assembly of Furnace, Model 1400 2 Blowers