INSTALLATION

Continued

Receptacle

Blower

FIELD WIRE

INCOMING

120V AC (FUSE BOX

OR BREAKER)

BLK

WHT

GRN

 

BLK

WHT

RECEPTACLE

BLOWER

CONNECTORS (NOT SUPPLIED)

 

 

 

 

 

 

 

 

105C

 

 

GND

 

 

 

 

 

 

GRN VARIABLE SPEED ELECTRICAL RATING: CONTROL 120v, 60Hz, 0.9A

original wire must be replaced, it must be

TEW minimum 16GA copper wire rated at

 

 

 

 

 

 

 

 

Note: If any of the

replaced with type

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Speed

 

 

Control

 

 

Shaft

 

 

Control

Lock

Hook and Loop

Mounting Strips

Knob

Nut

 

Figure 18 - Installing Optional Blower

GA3500A

Heat Deflective Hood installation

The factory supplied heat deflective hoods must be installed inside the fireplace opening on both sides for the safe operation of the unit as shown in Figure 19.

1.Remove protective covering from hoods.

2.Position deflective hood into opening on one side of the firebox and secure to the top of the opening using screws provided.

3.Secure the ends of the hood to the firebox using two screws (provided) for each side.

4.Repeat steps 2 and 3 to install hood on the opposite side of the firebox.

CAUTION: Do not clean hood with abrasive cleanser. Use only regular household cleaners and

Figure 17 - Optional Blower Wiring

Diagram

Operating Optional Blower GA3500A Light your gas appliance with the blower off. After about 10 minutes, turn the blower on to deliver heated air out the top louvers. The blower features a variable control which allows you to select the blower speed you desire.

Note: Periodically check the louvers of the firebox and remove any dust, dirt or obstructions.

a smooth cloth.

Front Hood

(Typical Each Side)

Corner

Post

3 Screws

2 Screws Each (Top)

End of Hood

Figure 19 - Typical Hood Installation

(Both Sides)

14

www.desatech.com

105116-01D

Page 14
Image 14
Vanguard FBST manual Heat Deflective Hood installation, Receptacle