Vanguard Heating VN12A Installing To Wall, Continued, Floor, Mounting Screw Locations, Minimum To

Models: VN6B VN12A

1 28
Download 28 pages 50.34 Kb
Page 10
Image 10
CEILING

10

INSTALLING TO WALL

Continued

For convenience and efficiency, install heater

where there is easy access for operation, inspection, and service

in coldest part of room

CEILING

36"

Minimum

Right 8" Minimum

From Of Carpeting, Tile Or OtherFLOORScrew Sides Of

Heater

Right

LeftSide

Side

3" Minimum To Top Surface

Of Carpeting, Tile Or Other

Combustible Material

FLOOR

Figure 4 - Mounting Clearances As Viewed From Front of Heater

INSTALLING HEATER TO WALL

Marking Screw Locations

1. Determine where you will locate heater.

Minimum To WARNING

Maintain minimum clearances shown in Figure 5. If you can, provide greater clearances from floor and joining wall.

2. Mark two mounting screw locations on wall (see Figure 5).

JOINING 10 7/8"ClearanceFigure 5 - Mounting Screw Locations 7 3/4"Manual background

Minimum To

Maintain 8"

Clearance

From Wall

WALL

Mounting

20 1/4"

 

Screw
Minimum To
JOINING

Locations

Maintain 3"

 

Clearance

 

 

 

 

From Floor

FLOOR

Figure 5 - Mounting Screw Locations

100845

Page 10
Image 10
Vanguard Heating VN12A Installing To Wall, Continued, CEILING 36 Minimum 8 Minimum From Sides Of Heater, Floor, Screw