Vinotemp 250SCU manual VINO-1500SSW VINO-2500SSW Installer’s Instruction, Condensing Unit

Models: 250SCU

1 5
Download 5 pages 61.17 Kb
Page 1
Image 1
VINO-1500SSW

VINO-1500SSW

VINO-2500SSW

Installer’s Instruction

Federal law requires that WINE-MATE split cooling systems be

installed by an EPA certified refrigeration technician.

WINE-MATE split system is shipped as components and is ready for use only after a certified refrigeration technician has properly installed, charged and tested the system. Proper installation is critical. Vinotemp can only warrant the quality of the components. The installation and proper operation of the system must be warranted by the installer. Installation of the system must be done in accordance with all state and local building codes.

The condensing unit and evaporator unit are connected by a liquid line and an insulated suction line that are supplied by the installer. These lines must be properly sized for the distance between the two units. After the units and the lines are installed, the system must be pressure tested. If no leaks are found, evacuate and charge system with R134A. Refrigerant amount will vary depending on the length of line set.

1. Condensing Unit

Place the condensing units WM-150SCU and 250SCU in a properly ventilated location. If it is not, heat exhausted by the condensing unit will build up and the cooling system will not operate properly.

Leave minimum 5 feet clearance for the exhaust side and leave minimum 1 foot clearance for the fresh air intake side.

Condensing unit shall be elevated to avoid possible flooding and shaded from direct sun. It shall not be exposed to temperatures higher than 110 °F or lower than 45 °F (optional low ambient kit for 20 °F).

2. Evaporator Unit

Page 1
Image 1
Vinotemp 250SCU manual VINO-1500SSW VINO-2500SSW Installer’s Instruction, Condensing Unit, Evaporator Unit