
Assembly Instructions
SETUP INSTRUCTIONS
The PERFAERATOR™ is shipped partially assem- bled. After uncrating, initial setup is required.
NOTE: During the process of unpacking, any damaged or missing parts should be noted and reported to the delivering carrier immediately (put in writing within 15 days). The carrier will provide directions for proceeding with a claim to receive compensation for damage.
Lift Lever Installation
The lift lever for the camshaft assembly position is partially assembled. Stand the lift lever upright and attach the remaining hardware.
Lift Lever
Install Lift Lever Handle
(stand upright and insert hardware)
Installation on Tractor
1.Remove the mower deck from the tractor if nec- essary. Refer to the appropriate Tractor Owner's Manual.
2.Lightly grease each tractor support arm (2) on the tractor.
Mounting
Tubes
Attach Aerator to Tractor
3.Engage the aerator frame tube sockets on the tractor support arms. Slide the implement hitch onto the support arms approximately 3 in. (76 mm).
Only use PTO
Connect Driveline Coupler to Tractor PTO
4.Connect the aerator driveline to the tractor PTO shaft by sliding back the locking collar on the yoke, then push the yoke over the PTO shaft until the locking collar snaps back fully. Make sure the driveline is well secured at both ends.
DANGER
This shaft turns at very high RPM. If the collar is not locked to the PTO shaft at the tractor end, or if the yoke at the aerator end is not secured properly, the driveline can fly loose with great force capable of causing serious injury or death.
5.Install the hitch pin through the hole on the end of each support arm to lock the hitch in place. Two (2) hitch pins are included in the owner’s packet of materials.
9