Wayne-Dalton 9800 Top Fixtures, Stacking Sections, Top Section, Drawbar Operator Bracket

Models: 9800

1 18
Download 18 pages 4.37 Kb
Page 8
Image 8
Top Fixtures

Flag angle

Vertical

5/16” x 1-5/8”

track

assembly

Lag screws

Jamb

 

bracket

 

Bottom

Track

section

rollers

12R FA 15R FA 12R QI 15R QI

Flag angle lag screw locations

3/8” to 5/8”

 

Spacing

 

Bottom section

 

Vertical track

Track roller

Floor

 

9

Top Fixtures

Tools: Power drill, 7/16” Socket driver

 

Remove, but retain (2-4) 1/4”- 14 x 7/8” self drilling screws from the right side of the strut, allowing enough room to slide the top fixture between the section and the strut.

Slide the top fixture assembly between the strut and section. Align the edge of the top fixture parallel to the top section edge. Secure the top fixture and strut to the top section with (3) 1/4”- 20 x 7/8” self drilling screws through the upper and lower slots of the top fixture. Finish re-attaching the strut using the 1/4”- 20 x 7/8” self drilling screws removed previously. Insert track roller into top fixture. Repeat for left hand side.

Top

Strut

Short stem

section

 

 

track roller

 

 

Top fixture

 

 

base

 

(3) 1/4”-20 x 7/8”

 

 

Self drilling screws

 

 

 

End cap

8

Stacking Sections

Tools: Power drill,7/16” Socket driver

 

Note: The sections can be identified by the graduation of the factory installed end hinges. The smallest graduated end hinge on section should be stacked on top of the bottom section, with each graduated end hinge increasing as the sections are stacked, see Parts Breakdown on page 2.

Note: Make sure graduated end and center hinges are flipped down, when stacking another section on top.

Note: Larger doors will use long stem track rollers with double graduated end hinges. Place track rollers into graduated end hinges of remaining sections.

With assistance, lift second section and guide the track rollers into the vertical tracks. Lower section until it is seated against bottom section. Align vertical marks in the upper alignment sticker, with the lower alignment sticker on right hand side, on the back of door. Keep sec- tions aligned and fasten center hinge(s) first; then end hinges last using 1/4”-14 x 5/8” self tapping screws.

NOTE: To prevent center hinge leaf(s) from rotating, first secure the top middle hole of the center hinge leaf with one 1/4” – 14 x 5/8” self-tapping screw then secure the other two holes.

NOTE: Larger doors with double graduated end hinges, fasten both hinges to connect the sections using 1/4” - 14 x 5/8” self-tapping screws.

Repeat same process for other sections, except top section.

10

Drawbar Operator Bracket

Tools: Power drill, 7/16” Socket driver

 

Note: If you’re installing a drawbar operator, the drawbar operator bracket must be mounted and secured prior to installing top section.

Important: when connecting a drawbar operator type garage door opener to this door, a Wayne-Dalton operator/ drawbar operator bracket must be securely attached to the top section of the door, along with any strut provided with the door. The installation of the drawbar operator must be ac- cording to manufacturer’s instructions and force settings must be adjusted properly.

Remove, but retain (4-6) 1/4”-20 x 7/8” self drilling screws from the center of the strut, allowing the drawbar operator bracket to slide between the section and the strut.

NOTE: For retro fit applications, the drawbar operator bracket must be aligned with an exist- ing drawbar operator.

Locate the center of the top section and slide drawbar operator bracket under strut till the drawbar operator bracket is seated against the strut flange.

NOTE: Prior to fastening drawbar operator bracket to top section, ensure the top edge of drawbar operator bracket is aligned with the top edge of the section, as shown.

Attach the drawbar operator bracket using (8) 1/4” – 20 x 11/16” self drilling screws (as shown). Finish re-attaching the strut using the self tapping screws removed previously.

Important: Push & hold the hinge leafs securely against the sections while securing with 1/4”-14 x 5/8” self tapping screws. There should be no gap between the hinge leafs and the sections.

Top section

Strut

Top section

Stacking SectionsDrawbar Operator BracketTop Section Drawbar Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background operator bracket

Strut

Left double graduated

end hinge with long

stem track roller

Right double graduated

end hinge with long

stem track roller

Lock section

Alignment

sticker

 

 

 

Vertical tracks

Alignment sticker

1/4”-14 x 5/8” Self tapping screw locations

Secure top

Manual background middle hole first

Left graduated end hinge

Center

Right graduated end hinge

hinge(s)

with short stem track roller

with short stem track roller

1/4” - 20 x 7/8” Self-drilling screws

Drawbar operator

(8) 1/4” - 20 x 11/16”

bracket in place

Self-drilling screws

under strut

 

Top Section

11 Tools: Hammer, Power drill, 7/16” Socket driver, 7/16” Socket, 7/16” Wrench, Ratchet wrench, Step ladder, Tape measure

Place the top section in the opening. Temporarily secure the top section by driving a nail into the header near the center of the door and bending it over the top section. Now, flip up the graduated end hinge and center hinge leaves, hold tight against section, and fasten center hinges first and end hinges last (refer to step, Stacking Sections). Vertical track alignment is critical. Position flag angle between 1-11/16” (43 mm) to 1-3/4” (44 mm) from the edge

8

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer,

refer to your local yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com

Page 8
Image 8
Wayne-Dalton 9800 installation instructions Top Fixtures, Stacking Sections, Top Section, Drawbar Operator Bracket