Weber 500 LX Gas line piping, Test connections, Typical natural gas supply installation. Figure

Models: 500 LX

1 32
Download 32 pages 33.83 Kb
Page 13
Image 13

Typical natural gas supply installation. Figure 11.

Gas supply

Inside wall

Outside wall

Shut off

To barbecue

 

Quick disconnect

Male fitting

Locking

shut off

 

The quick disconnect is installed above ground

Figure 11

Install gas supply (continued)

Pipe compound should be used which is resistant to the action of natural gas when NPT connections are made.

The outdoor connector must be firmly attached to rigid, permanent construction.

Gas line piping

If the length of line required does not exceed 50 feet, use a 5/8" O.D. tube. One size larger should be used for lengths greater than 50 feet.

Gas piping may be copper tubing, type K or L; polyethylene plastic tube, with a minimum wall thickness of .062 inch; or standard weight (schedule 40) steel or wrought iron pipe.

Copper tubing must be tin-lined if the gas contains more than 0.3 grams of hydrogen sulfide per 100 cubic feet of gas.

Plastic tubing is suitable only for outdoor, underground use.

Gas piping in contact with earth, or any other material which may corrode the piping, must be protected against corrosion in an approved manner.

Underground piping must have a minimum of 18" cover.

Test connections

All connections and joints must be thoroughly tested for leaks in accordance with local codes and all listed procedures in the latest edition of ANSI Z223.1.

mDANGER

Do not use an open flame to check for gas leaks. Be sure there are no sparks or open flames in the area while you check for gas leaks. This will result in a fire or explosion which can cause serious bodily injury or death, and damage to property.

13

Page 13
Image 13
Weber 500 LX owner manual Gas line piping, Test connections, Typical natural gas supply installation. Figure