10
8
ASSEMBLY
CAUTION: Use two people to lift and install the Summit®
A.) Lift the frame assembly into the “island” structure opening. Make sure the frame is resting level on the fi nished surface of the structure. B.) Adjust the Front Vent to rest squarely on ground.
A.
1
1
1
b
a
1
a
1
1
|
|
| CLEARANCES |
B. |
|
| |
| 1 | 24" (610 mm) Any Surface | |
|
|
|
|
|
|
|
|
|
| a | Grill Frame |
|
| b | Note: For a countertop treatment: Recommended 19.1 mm (3/4˝ |
|
|
| inch) overhang. Notch front edge for frame to fully slide in. |
|
|
|
|
WWW.WEBER.COM®