2.Other manufacturer(s) or other
a)Full intent of these specifications, and provide complete submittal including literature, wiring diagrams, fuel piping diagrams, and a list of similar installations.
b)Submittal to be presented to specifying engineer at least seven working days for approval before bid opening. Substitutions are not permitted after contract is awarded.
c)Burner(s) and Energy Management Control System(s) must be tested and approved for installation with specified boiler by boiler manufacturer.
B.Boiler construction
• Boiler sections
• Assembled with short, individual draw rods.
• Cast with sealing grooves for high temperature sealing rope to assure permanent
• Sealed
• Must be
• Provided with sufficient tappings to install required controls.
• Limited 10 year warranty against workmanship and defects to be in writing by manufacturer.
C.Boiler(s)
• Provided with
• Provided with expansion tank tapping to divert separated air to expansion tank.
• Constructed to provide balanced water flow through entire section assembly using single supply and return connections for water. No external headers are necessary for water. Steam requires an external header 24” minimum from the waterline to the bottom of the header.
• Designed with a low silhouette to provide maximum headroom.
• Furnished with insulated burner mounting plate having necessary holes and tappings to mount burner. High temperature sealing rope is used to provide permanent
• Furnished with two observation ports (one in front and one in back) to allow visual inspection of the flame.
• Provided with cast iron flue collar with a
• High temperature sealing rope used to provide permanent
• Furnished with cast iron cleanout plates to cover cleanout openings on the front of the boiler(s).
• Elastomer sealing rings are to be used to provide permanent
2