Universal Control System – Propane gas
III Gas piping
1.Contact gas supplier to size pipes, tanks and regulator.
a.Inlet gas pressure to manual main
b.If pressure to gas valve exceeds 13” W.C., install 100%
2.Remove gas supply knockout disc from jacket panel.
3.Follow good piping practices.
4.Pipe joint compound (pipe dope) must be resistant to corrosive action of liquefied petroleum gases. Apply sparingly only to male threads of pipe joints.
5.Install drip leg at inlet of gas connection to boiler. Where local utility requires, extend drip leg to floor.
6.Install ground joint union when required for servicing.
7.Support piping by hangers, not by boiler or its accessories.
8.Purge all air from supply piping.
9.Before operating boiler, check boiler and its gas connections for leaks.
Do not check for gas leaks with an open flame – BUBBLE TEST. Failure to use bubble test or test for leaks can cause severe personal injury, death or substantial property damage.
a.Close manual main
b.Disconnect boiler and gas valve from gas supply piping during any pressure test greater than 13” W.C.
10.Set gas pressure switch as follows or to local inspector’s requirements
a.High – 14” W.C.
11.Canada only - manual main
IV Wiring
For your safety, turn off electrical power supply before making any electrical connections to avoid possible electrical shock hazard.
1.All wiring must be installed in accordance with the requirements of the National Electrical Code and any additional national, state or local code requirements having jurisdiction. All wiring must be N.E.C. Class 1.
2.The boiler must be electrically grounded in accordance with the National Electrical Code, ANSI/NFPA No.
3.Canadian installations must conform to CSA C22.1 Canadian Electrical Code Part 1 and any local or provincial codes.
4.Supply wiring to the boiler must be No. 14 gauge or heavier. Install in conduit.
5.A separate electrical circuit with a fused disconnect switch (15 amp. recommended) should be used for the boiler.
Part Number | 5 |