Weil-McLain EG-30 THRU -75 Control installation, EG-75water boilers without tankless heaters

Models: EG-30 THRU -75 PEG-30 THRU -65

1 24
Download 24 pages 63.63 Kb
Page 5
Image 5
Control installation

Standing Pilot Boilers — Control Supplement

Control installation

For your safety, turn off electrical power supply and turn off external gas supply valve before attempting to work on the boiler. Failure to comply can cause severe personal injury, death or substantial property damage.

EG-30 thru -65 water boilers without tankless heaters

1. Mount and wire controls per wiring diagram, page Figure 1 4, and Figure 1.

a.Attach junction box inside left jacket panel with #8-32 x ½” machine screws provided.

b.Install transformer with plug-in relay receptacle and relay.

c.Operating and limit circuit wiring must be 18 gauge or heavier.

2.Bring supply wiring to boiler. Must be 14 gauge or heavier.

3.Proceed to page 12.

EG-75 water boilers without tankless heaters

1. Mount and wire controls per wiring diagram, page Figure 2 4, and Figure 2.

a.Attach junction box inside left jacket panel with #8-32 x ½” machine screws and green ground nuts provided.

b.Install transformer with plug-in relay receptacle and relay. In Canada, use chain and hook strain relief.

c.Operating and limit circuit wiring must be 18 gauge or heavier.

2.Bring supply wiring to boiler. Must be 14 gauge or heavier.

3.Proceed to page 12.

Part Number 550-110-032/0607



Page 5
Image 5
Weil-McLain EG-30 THRU -75, PEG-30 THRU -65 manual Control installation, EG-75water boilers without tankless heaters