Weil-McLain EG-30 THRU -75, PEG-30 THRU -65 manual Control installation continued

Models: EG-30 THRU -75 PEG-30 THRU -65

1 24
Download 24 pages 63.63 Kb
Page 7
Image 7
Control installation continued

Standing Pilot Boilers — Control Supplement

Control installation continued

For your safety, turn off electrical power supply and turn off external gas supply valve before attempting to work on the boiler. Failure to comply can cause severe personal injury, death or substantial property damage.

EG-30 thru -65 water boilers with tankless heaters

1. Mount and wire controls per wiring diagram, page Figure 3 6, and Figure 3.

a.Install combination limit control and relay in tap- ping. See Boiler Manual control tapping table. Op- erating and limit circuit wiring must be 14 gauge or heavier.

2.Bring supply wiring to boiler. Must be 14 gauge or heavier.

3.Proceed to page 12.

Note: Tankless heater not available on EG-75 standing pilot boilers.

Part Number 550-110-032/0607



Page 7
Image 7
Weil-McLain EG-30 THRU -75 manual Control installation continued, EG-30thru -65water boilers with tankless heaters