Control Supplement — Standing Pilot Boilers
with probe-type low water cutoff
For your safety, turn off electrical power supply and turn off external gas supply valve before attempting to work on the boiler. Failure to comply can cause severe personal injury, death or substantial property damage.
1. Mount and wire controls per wiring diagram, page
8, and Figure 3. | Figure 3 | |
| ||
a. | Attach junction box inside left jacket panel with |
|
|
| |
| nuts provided. |
|
b. | Install transformer with |
|
| and relay. In Canada, use chain and hook strain |
|
| relief. |
|
c. | Operating and limit circuit wiring must be 18 |
|
| gauge or heavier. |
|
2. Bring supply wiring to boiler. Must be 14 gauge or heavier.
Part Number | 9 |