Number: SB0203 (Page 1 of 2)
Date: November 22, 2002
Subject: Water Boiler Installations with
Primary/Secondary pumping is the preferred method for system temperature modulation in commercial hydronic heating installations.
Piping Selection:
1.Use
2.Follow basic boiler piping instructions in the boiler manual.
1.Use valves with minimum timing of four minutes from one extreme position to the other.
2.Size to circuit design requirements. Follow manufacturer’s recommendations. Normally valve will be one or two pipe sizes smaller than recommended boiler piping size.
3.Avoid oversizing to prevent poor control of mixed water.
4.Pressure drop across the valve should be high enough to provide accurate control without “hunting”.
Circulator Selection:
1.Size system circulator to circuit flow characteristics. Specify gpm and head requirements.
2.Size each
[1/4 to 1/3 flow (gpm) of system circulator] X | 1 | |
# of boilers used | ||
|
3. All circulators must run at the same time.
EXAMPLE: Specify equipment to
Piping: (1) tee, (1) ell, (1) 45° tee
System flow rate with 20° ∆T through boiler = 1,000,000 btuh = 100 gpm 10,000 btuh
1 | = 25 gpm | ||
1 boiler | |||
|
|
In most cases a standard booster pump can provide the necessary flow at