Technical Services Bulletin No: SB0203 (Page 2 of 2)
Subject: Water Boiler Installations with
Date: November 22, 2002
FROM SYSTEM
| PUMP |
|
|
TO | P1 |
| PUMP |
SYSTEM |
| ||
|
| VALVE |
|
|
|
| P2 |
|
|
| AT LEAST |
|
|
| 10 TO 20 |
|
|
| PIPE |
|
|
| DIAMETERS |
|
|
| BOILER |
Figure 1
FROM SYSTEM
| PUMP |
|
|
|
|
|
TO | P1 | PUMP |
| PUMP |
| |
|
|
|
| |||
SYSTEM |
| VALVE |
|
|
|
|
|
|
| P2 | AT LEAST | P3 | AT LEAST |
|
|
|
|
| ||
|
|
|
| 10 TO 20 |
| 10 TO 20 |
|
|
|
| PIPE |
| PIPE |
|
|
| BOILER | DIAMETERS | BOILER | DIAMETERS |
|
|
|
|
|
Figure 2