![combustible wall)](/images/new-backgrounds/55322/5532213x1.webp)
Figure 8 Sidewall termination installation
¼" to ¾" between stop on termination and metal plate
4" galvanized sleeve |
| |
(through 4¹⁄₈" hole for | Pipe section | |
combustible wall) |
| |
Metal plate |
| Metal plate |
|
| |
|
| Spacers (2) |
Pipe section |
| (to support and |
| center vent in | |
Sealant |
| sleeve) |
Sealant |
|
|
Termination coupling |
|
|
|
| 26809 |
Figure 9 | Figure 10 | |
termination coupling) |
| Follow |
Follow |
| for proper installation of vent runs, including |
for proper installation of vent runs, including |
| slope and support. |
slope and support.
vent starter tee
Part Number
|
|
| vent starter tee |
26804b | 26805b |
7