4. See the left inset drawing. Identify the two Frame | 4 |
|
|
|
Spacers (45). Open the included packet of |
|
|
| |
38 |
|
|
| |
grease, and apply grease to both sides of both |
|
| 39 |
|
Frame Spacers. Next, identify the outer side of |
|
|
| |
|
|
|
| |
each Frame Spacer. |
|
|
|
|
Hold a Frame Spacer (45) between the Right |
| 12 |
|
|
Upright (39) and the Lift Frame (41), with the |
|
|
| |
|
|
|
| |
outer side of the Frame Spacer facing the |
|
|
|
|
Right Upright. Attach the Right Upright to the |
|
| 7 |
|
Lift Frame with a Frame Bolt (1), an Upright |
|
|
| |
|
|
| 1 | |
Washer (7), and a Nut (12); do not tighten the |
|
|
| |
|
|
|
| |
Nut yet. |
|
|
|
|
| 41 | 45 |
|
|
|
|
|
| |
| 45 |
| 39 |
|
|
|
|
| |
|
| Outer | 12 |
|
|
|
|
| |
|
| Side |
|
|
|
|
| 7 | 1 |
|
|
|
| |
|
| Inner | 45 |
|
|
| Side | 41 |
|
|
|
|
| |
5. Hold the remaining Frame Spacer (45) between | 5 |
|
|
|
the Left Upright (38) and the Lift Frame (41), |
|
|
| |
38 |
|
|
| |
with the outer side of the Frame Spacer fac- |
|
|
| |
ing the Left Upright. Attach the Left Upright to |
|
|
|
|
the Lift Frame with a Frame Bolt (1), an Upright |
|
|
|
|
Washer (7), and a Nut (12); do not tighten the |
| 12 |
|
|
Nut yet. |
|
|
| |
|
|
|
| |
| 7 |
|
|
|
| 1 |
|
|
|
|
| 45 | 41 |
|
|
|
|
| |
| 45 |
| 38 |
|
|
| Outer | 12 |
|
|
|
|
| |
|
| Side |
|
|
|
| 1 | 7 |
|
|
| Inner | 45 |
|
|
| Side | 41 | |
|
|
| ||
| 8 |
|
|
|