IL 33-DAH-1

Page 9

Step 11: Installing the 2-Point Terminal Block

A.Mount the 2-Point Terminal Block to the

pre-drilled holes in the right Trip Unit Support Bracket as shown, using the (2) .138-32 × .750" screws, (4) flat washers, (2) lock washers, and

(2) nuts supplied.

B.Route the DTA wires from the DTA Assembly to the 2-Point Terminal Block. After assuring the wires are clear of any moving components within the Breaker, connect the DTA wires to the 2-Point Terminal Block.

For Kits Supplied with a Breaker Mounted CPT Only.

Step 12: Installing the Breaker Mounted CPT

A.Align the holes in the Breaker Mounted CPT with the predrilled holes on the left side of the Trip Unit Mounting Platform. Secure the CPT to

the Trip Unit Mounting Platform using the (4)

.190-32 × .500" screws, (8) flat washers, (4) lock washers, and (4) nuts supplied. Note that the X1 and X2 terminals face the front of the Breaker.

B.Insert the black plug of the CPT Harness into the receptacle in the Trip Unit.

Effective December, 1998