Westinghouse UL-ES-Parkway-WH10 owner manual Normal Downrod Option, Para Cielorraso Normal

Models: UL-ES-Parkway-WH10

1 24
Download 24 pages 62.57 Kb
Page 10
Image 10
NORMAL  DOWNROD  OPTION

NORMAL  DOWNROD  OPTION

OPCIÓN CON VARILLA VERTICAL

PARA CIELORRASO NORMAL

8

2 OPCIÓN CON VARILLA VERTICAL

3

1PARA CIELORRASO NORMAL

Feed motor lead wires through downrod/canopy assembly and insert downrod into downrod yoke. Make sure to align hole in downrod with the hole in downrod yoke. Install yoke cross pin (1) through yoke and downrod. Insert clamp pin (2) into cross pin until it snaps into place. Tighten set screws (3) in yoke. PROCEEDTO PAGE 13, STEP 13.

Pase los hilos conductores del motor a través de la varilla vertical/conjunto del dosel e inserte la varilla vertical en la horquilla de la misma. Asegúrese de que el orificio de la varilla vertical y el de la horquilla de la varilla vertical estén alineados. Instale el pasador transversal de la horquilla (1) pasándolo por la horquilla y la varilla vertical. Inserte el pasador de fijación (2) en el pasador transversal hasta que escuche un chasquido que indique que está en la posición adecuada. Ajuste los tornillos de fijación (3) en la horquilla. PROCEDA A LA PÁG. 13, PASO 13

UL-ES-Parkway-WH10

EXTENDED  DOWNROD  OPTION

OPCIÓN CON VARILLA

VERTICAL MÁS LARGA

93

1

2 2

Loosen downrod ball (1) from downrod (2) by removing set screw (3).

Afloje la esfera de la varilla vertical (1) de la varilla vertical (2) quitando el tornillo (3).

10

Page 10
Image 10
Westinghouse UL-ES-Parkway-WH10 Normal Downrod Option, Para Cielorraso Normal, Opción Con Varilla Vertical Más Larga