12 pg_W-239_EFS 2/23/06 11:25 AM Page 4

MOUNTING AND WIRING INSTRUCTIONS

NOTE: Underwriters Laboratories (UL) does not require all fixtures to have ground wires. These fixtures meet all UL specifications.

1.Turn off power at circuit box to avoid possible electric shock.

2.Pass wires from fixture body (A) through center pipe (B), and thread center pipe (B) into coupling (C) (if applicable).

3.Secure mounting bar (D) to outlet box (E) with outlet box screws (F) (not included) (see fig. 1).

4.Thread hex nut (G) onto mounting nipple (H) approximately 1/4 inch and insert lockwasher (I), then thread mounting nipple (H) onto mounting bar (D) and secure with hex nut (G).

5.Thread fixture loop (J) onto nipple (K).

6.Open one link on bottom end of chain (L). Attach to fixture loop (J). Securely close link on chain (L).

7.Thread screw collar ring (M) onto screw collar (N), then place canopy (O) over top of screw collar (N).

8.Lace wires up through every other link on chain (L) then up through screw collar (N), canopy (O) and mounting nipple (H).

9.Open one link on top end of chain (L). Attach to loop on screw collar (N). Securely close link on chain (L).

10.Identify color coding of fixture wires (see fig. 2).

11.To connect wires, take black fixture wire (group A from fig. 2) and place evenly against black outlet box wire. Do not twist wires.

12.Fit wire connector (P from fig. 1) over wires and twist until there is a firm connection. If wire connector (P) easily comes off, reattach and check again for a firm connection.

13.Repeat steps 11 and 12 with the white (group B from fig. 2) fixture wires and outlet box wires.

14.Partially thread green grounding screw (Q) into side hole (R) on mounting bar (A) (see fig. 1).

15.Wrap ground wire from fixture around green grounding screw (Q) leaving enough excess wire to then connect ground wire and outlet box wire with wire connector (P), if applicable.

16.Tighten green grounding screw (Q). Do not over tighten.

17.Remove screw collar ring (M) from screw collar (N) and secure screw collar (N) to mounting nipple (H).

18.Tuckwires inside outlet box (E).

19.Raise canopy (O) to ceiling and secure screw collar ring (M) to screw collar (N).

FIXTURE ASSEMBLY INSTRUCTIONS

Warning: This fixture is for indoor use only.

1.Install candle cover(s) (S) over socket(s) (T), and install lamp(s) (U). Do not exceed recommended wattage.

2.Install glass panels (V) onto rods (W) of fixture rings (X).

3.Turn power back on at circuit box.

4

Page 4
Image 4
Westinghouse W-239 owner manual Mounting and Wiring Instructions, Fixture Assembly Instructions

W-239 specifications

The Westinghouse W-239 is a nuclear reactor design that stands out for its innovative features and reliability. Primarily developed for commercial power generation, this pressurized water reactor (PWR) boasts a number of technological advancements that enhance its efficiency and safety.

One of the main characteristics of the Westinghouse W-239 is its thermal power output, capable of generating approximately 900 megawatts electric (MWe). This output makes it suitable for medium to large-scale electricity demands, powering thousands of homes and businesses. The reactor employs a two-loop system, a design that optimizes thermal efficiency and minimizes losses, allowing for better heat transfer from the core to the steam generator.

The W-239 utilizes advanced fuel technology, employing enriched uranium fuel assemblies that are designed for longer operational cycles. This improves fuel utilization and reduces the frequency of refueling outages, ultimately leading to greater overall productivity. The reactor can operate on a 18-24 month refueling cycle, which is advantageous for maintaining continuous energy supply and reducing operational downtime.

Safety is a paramount consideration in the design of the W-239. It incorporates multiple safety systems that ensure the reactor can withstand unexpected events, including natural disasters and equipment failures. The reactor's design features a robust containment structure, emergency core cooling systems, and redundant safety features that collectively bolster its resilience.

In terms of control systems, the W-239 integrates sophisticated digital instrumentation and control technology. These systems enhance operational efficiency by providing real-time monitoring and data analysis capabilities, allowing for quick adjustments in reactor operations based on prevailing conditions.

The Westinghouse W-239 also aligns with modern regulatory and environmental standards, featuring systems designed to minimize emissions and waste. Moreover, its modular design allows for easier maintenance and potential upgrades, ensuring its relevance in an evolving energy landscape.

Overall, the Westinghouse W-239 represents a significant advancement in nuclear reactor technology, marked by its balance of power generation, safety, and efficiency. Its innovative features and reliable performance make it a noteworthy option in the quest for sustainable energy solutions.