Windsor D250(115V) 10070100 manual Maintenance, D-250 PUMP MAINTENANCE

Models: D250(115V) 10070100

1 25
Download 25 pages 8.49 Kb
Page 10
Image 10

MAINTENANCE

D-250 PUMP MAINTENANCE

Per manufacturer’s recommendations the following maintenance should be performed utilizing noted kits:

1.) 500 hours-Kit 86201080 – PRV NO. 250-75A replaces the V-packing, wave washer, packing spreader and plunger guide.

2.) 500 hours-Kit 86201100 – PRV NO. 250-75C replaces the CAM bearing and insert.

3.) 1000 hours-kit 86201090 – PRV NO. 250-75B valve assembly and o-rings.

NOTE: Maintenance and repairs must be done by qualified personnel. Using non-Windsor parts to repair this machine will void the warranty. Contact an authorized Windsor dealer for complete details.

9

D-250 86038570 05/11/07

Page 10
Image 10
Windsor D250(115V) 10070100 manual Maintenance, D-250 PUMP MAINTENANCE