Windsor SCEX264, SCEOX264, SCEX324 Service Schedule, Maintenance, Before starting the work period

Models: 86037020 SCEX324 10052290 SCEOX324 SCEX264 10052330 10052300 10052320 SCEOX264

1 33
Download 33 pages 3.25 Kb
Page 19
Image 19
Before starting the work period

Before starting the work period

End of work period before storing

SERVICE SCHEDULE

MAINTENANCE

DAILY

Check battery acid level

*

Check vac hose connections

*

Clean the squeegee blades

*

Inspect brushes or pads for debris:

*

wire string, wear

 

Inspect vac fan shut off float screen

*

 

 

Drain & rinse tanks

*

 

 

Raise squeegee assembly

*

Raise scrub deck assembly

*

Charge the batteries.

*

Remove the pad drivers/brushes

*

Check the brushes/pads for damage

*

and/or wear

 

Clean squeegee blades.

*

Clean recovery tank shut off & screen

*

 

 

Check battery cells w/ hydrometer

 

Check solution strainer

 

Check pivot points, caster and

 

squeegee for proper lubrication

 

Inspect tank and hoses

 

 

 

Clean tops of batteries and tray

 

Check battery cable clamps

 

Use a vacuum to remove lint from the

 

motor windings

 

Grease casters

 

Grease axle bearings

 

Inspect all motors for carbon motor

 

brush wear

 

WEEKLY

*

*

*

*

MAINTENANCE

MONTHLY ANNUALLY

*

*

*

*

*

*

CUTTER 24V (SCE) 86037020 04/04/07

4-1

 

Page 19
Image 19
Windsor SCEX264, SCEX324 Service Schedule, Maintenance, Before starting the work period, End of work period before storing