INSTALLATION
It is mandatory that all operations required for the installation be carried out by a qualified or competent person - in accordance with existing rules and regulations.
Please ensure that when the appliance is installed it is easily accessible for the engineer in the event of a breakdown.
BUILDING IN
It is important that the dimensions and materials of the surround or cabinet into which the oven will be built are correct and will withstand a temperature increase of at least 60°C above ambient; and that proper arrangements are made of a continuous supply of air to the oven so it does not overheat.
Dimensions of the appliance and recess required are given below (Fig.
|
| 560 |
|
|
| 20 | 540 | 20 |
|
|
|
|
| |
|
|
|
| 19 |
888 | 863 |
| 594 |
|
|
|
| 556 | |
594 | 5 |
|
| 19 |
|
|
|
| |
FO 0792 |
|
|
| Fig. 1 |
|
|
|
| |
50 |
|
|
|
|
| 7 min |
|
| 50 |
| 878 |
|
| 550 |
min | min7 |
|
| 600 |
|
|
|
| |
800 |
| 560 min |
|
|
|
|
|
|
FO 0793
Fig. 2
6