Zanussi ZHC 950 manual Installing The Cooker Hood, Installation Requirements, Unpacking

Models: ZHC 950

1 20
Download 20 pages 45.36 Kb
Page 12
Image 12
INSTALLING THE COOKER HOOD

INSTALLING THE COOKER HOOD

15

14.1

7.312a 7.2.1 11

9

 

2.1

12c

 

2

 

2.2

 

11

12a

1

Please ensure that when the appliance is installed it is easily accessible to an engineer in the event of a breakdown.

All installations must comply with the local authorities requirements for the discharge of exhaust air.

Incorrect installation may affect the safety of this cooker hood.

Installation Requirements

Before installation check that the wall to which the cooker hood is to be fitted for electric cables, water pipes and gas.

This cooker hood is designed to be fixed to any vertical surface over a cooking area, and can be used in the extraction (ducted to the outside) or recirculation mode.

The installation work must be undertaken by a qualified and competent person.

The manufacturer disclaims any responsibility for damage due to incorrect installation of the cooker hood or if the hood is not installed in compliance with relevant regulations controlling this type of installation.

Unpacking

The hood is supplied with the following components for installation as illustrated. Item Qty Description

11 Hood body, complete with: Controls, lighting, blower and filters

21 Telescopic chimney comprising:

2.11 Upper section

2.21 Lower section

3.1 Ø120-125mm Ducting collar

9

1

Ø150-120mm Ducting spigot

14.12 Recirculation outlet ducting

 

 

extension

15

1

Recirculation outlet connection

7.2.12 Upper chimney fixing brackets

7.31 Reciruation outlet support

11.6 Rawl plugs

12a

6

4.2x44.4mm wall fixing screws

12c

6

2.9x9.5mm chimney fixing screws

 

1

Instruction Manual

10

Page 12
Image 12
Zanussi ZHC 950 manual Installing The Cooker Hood, Installation Requirements, Unpacking