Zenoah BK2651DL Set up, Installing The Shoulder Strap, Installing Cutting Head, Installing Handle

Models: BK2651DL

1 16
Download 16 pages 53.61 Kb
Page 8
Image 8
6. Set up

BK2651DL

6. Set up

INSTALLING THE SHOULDER STRAP

1.Hook the upper part of the shoulder strap at the notch on the top of the frame and pass it through the buckle as shown in the Figure, then secure it firmly.

2.Put the hook at the lower part of the shoulder strap in the strap installing location at the bottom of the frame.

Buckle

INSTALLING THE SHOULDER STRAPINSTALLING CUTTING HEADFrame

Hook

D-ring

INSTALLING CUTTING HEAD

1.While locking the gear shaft, by inserting the supplied tool into the upper holder on the gearbox, loosen and remove the hexagon nut (left-handed).

2.Then screw in the cutting head to the gear shaft over the holders. Hand-tighten it securely.

DEBRIS GUARD SKIRT FOR LINE HEAD

When using line head, make sure to attach the guard skirt.

INSTALLING HANDLE

Mount the handle to the shaft tube and clamp it at a location that the edge of CE label is matched with the handle.

DEBRIS GUARD SKIRT FOR LINE HEADINSTALLING HANDLE WARNING

Stop tightening the screws when the gap A be- comes zero.

CE label

CONNECTING THE FLEXIBLE SHAFT AND BK2651DL

1.Remove the retaining bolt (M5 x 10) at the center of the joint end and loosen the fixing bolt (M5 x 20). Loosen also the fixing screws (M5 x L20) at two loca- tions that fix the throttle lever assembly. Be careful not to drop the nuts.

2.Insert the throttle lever assembly in the main pipe.

3.Push the main pipe in the joint while rotating it gently to the right and left.

4.Align the retaining screw hole for the joint with the main pipe hole, screw in the retaining bolt and se- cure it firmly.

5.Tighten the joint fixing bolt to fix the main pipe se- curely.

[Tightening torque] 4.9 to 7.8 N-m (0.5 to 0.8 kg-m)

6.Slide the throttle lever assembly toward the joint, screw in the fixing screw and secure it firmly.

(1) Retaining hole

(2) Main pipe

(3) Cramp screw

(4) Joint

(5) Retaining bolt

BALANCE UNIT

1.Put on strap and attach unit to strap.

2.Slide clamp up or down until unit balances with head aparting from the ground when using it.

GB-8

Page 8
Image 8
Zenoah BK2651DL Set up, Installing The Shoulder Strap, Installing Cutting Head, Debris Guard Skirt For Line Head