Installation – Installing the Power Pack
! CAUTION: At least two installers are required due to the weight and size of the hood.
1.Install optional AK08xxAS Stainless Steel Liner. Review manual included with liner for more details.
2.If no liner is used cut out an opening in the bottom of the cabinet by following the dimensions in FIG 1.
3.Lift Power Pack into opening and ensure locking clip has locked into position. (locking clip is located on left side of Power Pack. FIG 2
4.Fasten (2) M4 screws into each long side of Power Pack. If a liner is used the screws will go through the Power Pack mounting holes, then the liner and into the wood base. note: Wood blocking may need to be added to cabinet base if additional support is needed. see FIG 3 and FIG 4
5.Install duct work and seal with duct tape.
7.Install electrical.
8.Remove all packing materials before using Power Pack. Switch power on and check for leaks around duct tape.
9.Install fi lter.
www.zephyronline.com
| 26 7/8” |
| C/L |
5/8” | C/L |
10 |
|
cabinet bottom
FIG 1
front view
Ductwork
wood base
locking clip
|
|
|
| mounting holes |
|
|
|
|
|
|
|
| |||
|
| metal or other non |
|
|
|
| controls |
|
|
|
|
|
| ||
|
|
|
|
|
| ||
|
| ||||||
|
| combustible material |
|
|
|
|
|
FIG 2
right side view
Ductwork
wood base 2” minimum
secure (2) M4 screws to mounting holes on each long side of Power Pack
FIG 3
Power Pack
Stainless Steel Liner
FIG 4
10